NexMetals Reports 7.55 Metres of 6.48% CuEq (2.70% Cu, 1.83% Ni) in SMD-26-219, Visual Intercept SMD-26-217 Intersects Three Mineralized Zones and Extends High-Grade Trend to Approximately 1.5 Kilometres
At a glance
NexMetals Mining Corp. (TSXV: NEXM) (NASDAQ: NEXM) ("NEXM" or the "Company") is pleased to report assay results from drill hole SMD-26-219 and a new visual intercept from drill hole SMD-26-217, part of its ongoing surface drilling program at the Selebi Main deposit in Botswana (see Figure 1). The results continue to support the Company's data-driven exploration model and highlights the potential for continued growth of the...
From the available Newsfile headline and excerpt. Company claims have not been independently verified.
Highlighted intercepts
Captured from the headline and available excerpt, ordered by screening score. May include overlapping intervals; this is not the complete assay table. Reported interval is not assumed to be true width. Scores exclude recovery, continuity, depth, capex and economics. Read the scoring method.
Read the source
Open the original report at Newsfile ↗Why this story is ranked here · 46/100
- Reported drill results
- Canadian region tag
- Source excerpt available
- Numerical intercept reported
Editorial priority, not an investment rating. This is the public ranking; personal watchlists can add a small boost in your feed. Methodology →