OREBRIEF · SOURCE REPORT
Surge Announces Positive Pre-Feasibility Study at Nevada North: After-Tax NPV8% of US$9.81 Billion, After-Tax IRR of 23.6% and Operating Cost of US$4,719/tonne Lithium Carbonate
Source: Newsfile · Reported October 2, 2026 · NILI
At a glance
Surge Battery Metals Inc. (TSXV: NILI) (OTCQX: NILIF) (FSE: DJ5) ("Surge" or the "Company") is pleased to announce the results of the Pre-Feasibility Study ("PFS") for the Nevada North Lithium Project ("NNLP", "Nevada North" or the "Project") located in Elko County, Nevada. The Project is held by Nevada North Lithium LLC ("NNL"), a joint venture owned 67.5% by Surge and 32.5% by Evolution Mining Limited ("Evolution Mining")....
From the available Newsfile headline and excerpt. Company claims have not been independently verified.
Read the source
Open the original report at Newsfile ↗Why this story is ranked here · 37/100
- Economic study
- Canadian region tag
- Source excerpt available
Editorial priority, not an investment rating. This is the public ranking; personal watchlists can add a small boost in your feed. Methodology →