Thunder Gold Intersects 232.5 Metres Averaging 0.450 g/t Au (Including 33.0 Metres Averaging 1.383 g/t Au) at Tower Mountain
At a glance
Thunder Gold Corp. (TSXV: TGOL) (FSE: Z25) (OTCQB: TGOLF) ("Thunder Gold" or the "Company") is pleased to announce the following infill diamond drill results from the Bench Target, at the Company's flagship Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario.Highlights: TM26-217 intersected 232.5 metres averaging 0.450 g/t Au from 360.0 metres (including 33.0 metres averaging 1.383 g/t Au);TM26-217 supports...
From the available Newsfile headline and excerpt. Company claims have not been independently verified.
Highlighted intercepts
Captured from the headline and available excerpt, ordered by screening score. May include overlapping intervals; this is not the complete assay table. Reported interval is not assumed to be true width. Scores exclude recovery, continuity, depth, capex and economics. Read the scoring method.
Read the source
Open the original report at Newsfile ↗Why this story is ranked here · 46/100
- Reported drill results
- Canadian region tag
- Source excerpt available
- Numerical intercept reported
Editorial priority, not an investment rating. This is the public ranking; personal watchlists can add a small boost in your feed. Methodology →